Reading List and Next Step

Begin to layout spaces – based on proper sizing based the use of the space and on the number of occupants and appropriate square footage.  Create a program chart – list each space and include the following

  • How many for each
  • Space Name
  • Square Footage
  • Number of Occupants
  • Size (length x width) proportions
  • Size of specialized equipment (NA or provide name and size)

https://openlab.citytech.cuny.edu/arch2330btech3sp16/files/2016/01/05-Planss-Egress-AA.BM_.PK_.pdf

https://openlab.citytech.cuny.edu/arch2330btech3sp16/files/2016/01/08.1-Occupancy-Egress-Exercise-king.pdf

https://www1.nyc.gov/site/buildings/codes/nyc-code.page

https://openlab.citytech.cuny.edu/arch2330btech3fa14/files/2014/08/The-Code-Corner No.-38-Elevators.pdf

https://openlab.citytech.cuny.edu/arch2330sp15king/files/2015/02/07.2-Stairs-Egress1.pdf

https://openlab.citytech.cuny.edu/arch2330sp15king/files/2015/02/07.1-Cores-Stairs.pdf

This entry was posted in Prof. King. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *