Due for Thursday Sept 10

  • Complete the media release form and return it to me
    • email it to pking@CityTech.Cuny.Edu
    • If for any reason you do not wish to sign it – just send me an email – you do not have to give a reason
  • Send us your meeting schedule with zoom or other links
    • It is OK if not all members can attend all meetings.  We want to see your schedule between now and Thursday and then we want to see your weekly meeting schedule.
    • Setup your meetings as recurring events in zoom.  (other means are OK)
    • Suggest you block out your schedule by starting on marking when you cannot meet (for example when you have other classes) then look for where free time overlaps.
  • Complete individual your Zoning Studies.
    • Model it first in the following order
      • Create the base massing (typically to a height of 85 feet)
      • Then model the setback tower – rectangular shape after the setbacks – make this super tall
      • Then draw the sky exposure planes and use these to slice the model –
      • If there are no sky exposure planes then there is often a maximum height
    • Site Plan, Block & Lot, Bldg Address, Zoning Group (R6-X, etc.) Calculate the lot areas.  Do not do any FAR calculations yet.
    • Zoning map and second site plan – you need the zoning map – the second site plan is optional.  Need to be able to see at least the three closest streets and if the site borders only on streets or on other lots.
    • Rear and Side Yards – Read carefully on these regulations.  Sometimes a side yard line after a certain distance become a rear yard and has a setback
    • Cite your sections of code on the drawings.
    • Isometrics (complete these before the sections)
    • Sections/Elevations – in some instances if you have a corner site with two sky exposure planes then you need to show elevations and not sections.  For other conditions of a through lot (streets on opposite sides) or a single street frontage – the section and elevations will match.
  • Complete the “What makes an Ideal Community”
    • Work as a class to complete the top board
    • Work as a team to complete the team board for presentation
    • Do not work on the individual board – you will do this later when you start design
  • Complete the “What makes an Ideal Special Zoning District
    • Work as a class to complete the top board
    • Work as a team to complete the team board for presentation
    • Do not work on the individual board – you will do this later when you start design

In class you will be presenting the following:

  • Teams Ideal Community
  • Teams Ideal Special Zoning District

Screen Captures from Today’s Class

Print this page
This entry was posted in Announcements, Day 04, Prof. King. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *