Project Class # Meeting Day Date Topic Covered/ Assignment
Site 1 W 8/28/19 Lesson 1- What is adaptive Reuse? What are good examples of these projects? Precedent Studies of Adaptive Reuse – 3 examples
Site 2 F 8/30/19 Site Visit
Site 3 W 9/4/19 Lesson 2 – Documentation of Site Analysis/ Examples of projects where site analysis made changes that impacted design. SITE STRATEGY DIAGRAM Group Site work assignment and Site Strategy Diagram
Site 4 Th(M) 9/5/19 Site Work/Model
Site 5 F 9/6/18 Site Work
Site 6 M 9/9/19 Site Analysis Presentation/ Intro to Project 1 Requirements Research Local Precedent Study that is assigned
Entry/lobby 7 W 9/11/19 Lesson 3: Precedent Studies/Lecture/Store Fieldtrip Precedent Studies of Hostels – 2 examples + 1 Assigned
Entry/lobby 8 F 9/13/19 Prededent Studies due – presentation/Assign Collages Collages due next class
Entry/lobby 9 M 9/16/19 Review Parti Collages in class/Show examples of Concept Models  Three models due for each collage
Entry/lobby 10 W 9/18/19 Lesson 4- Programming – Matrix and Bubble Diagrams/Design Alternative Bubble Diagram, Matrix, List of Program Spaces
Entry/lobby 11 F 9/20/19 Massing models 3 from each Collage Reviewed  Hybrid Final Model
Entry/lobby 12 M 9/23/19 Sectional and diagrammatic massing/plans Development of plans and sections based on bubble diagrams
Entry/lobby 13 W 9/25/19 Lesson 5- Spatial Organization and Circulation/Entrance and Connection to Exterior/Furniture Diagram of movement through spaces/Circulation Diagrams
Entry/lobby 14 F 9/27/19 Development of massing/plans/section based on bubble diagram Devleopment of project/study model on site
Entry/lobby 15 W 10/2/19 Lesson 6: Flooring + Lighting + Spec- Intro to Pinterest/Material application in Presentations Lighting Plans-RCP/Fixtures/ Flooring materials/Spec Sheet/
Entry/lobby 16 F 10/4/19 Crit
Entry/lobby 17 M 10/7/19 Crit
Entry/lobby 18 F 10/11/19 crit
Entry/lobby 19 W(M) 10/16/19 crit-Discussion of materials,lighting, flooring in project continue to develop project with matierials and fixtures
Entry/lobby 20 F 10/18/19 crit
Entry/lobby 21 M 10/21/19 crit
Entry/lobby 22 W 10/23/19 Lesson 7- IKEA Furniture Dimensions and Layout – Site Visit Dimensional exercise based on site visit to Ikea
Entry/lobby 23 F 10/25/19 crit Furniture selesction and placement in project
Entry/lobby 24 M 10/28/19 crit
Entry/lobby 25 W 10/30/19 Lesson 8: Presentation Organization and Layout Development of presentation boards 11×17 to present digitally
Entry/lobby 26 F 11/1/19 crit
Entry/lobby 27 M 11/4/19 Presentations
Rooms 28 W 11/6/19 Finish Presentations Blow up of typical room types- materials, furniture layout/elevations
Rooms 29 F 11/8/19 Crit
Rooms 30 M 11/11/19 crit
Rooms 31 W 11/13/19 Lesson 9 – Intro to Bedroom Layout/Furniture in Hostels ADA Bathroom Blow up with matierals, fixtures and layout/elevations
Rooms 32 F 11/15/19 crit
Rooms 33 M 11/18/19 crit
Rooms 34 W 11/20/19 Lesson 10: ADA Bathroom Kitchen Blow up sheet with materials, appliances and layout/elevations
Rooms 35 F 11/22/19 crit
Rooms 36 M 11/25/19 crit
Rooms 37 W 11/27/19 Lesson 11: Small Kitchen for Guests
Rooms 38 M 12/2/19 crit Locate Key outdoor areas
Rooms 39 W 12/4/19 Lesson 12: Outdoor space/Balconies/

Lesson 13 – Façade Development

Design alternatives – 3 different types of exterior materials / fenestration Façade
Rooms 40 F 12/6/19 crit
Rooms 41 M 12/9/19 crit
Rooms 42 W 12/11/19 Lesson 14:  Final Review Review of presentation layouts and content
Rooms 43 M 12/16/19 Presentations
Rooms 44 W 12/18/19 Presentations Both Professors to attend
Rooms 45 F 12/20/19 Final PDF Submittal