Phase 2 Presentation Grading and Requirements

Phase 2 

Youth Hostel 

Grading and Final Requirements: 

 10pts Concept Development Sheet ** (this sheet needs to be collected for NAAB req.) 

  • This page should show the initial concept and its integration/transformation into the project 

10pts Floor Plans (plans have to show furniture layout) 

 Blow-up Floor plans, 2 Interior Elevations, with images of all furniture and materials for: 

          5pts  Single Room 

          5pts  4 Bedroom 

          5pts  6 bedroom 

          5pts  8 bedroom 

 10pts Exterior Elevations with cladding materials and windows, People and trees – Context 

 10pts Interior elevations/Sections (minimum 2) 

10pts  Lighting layout with images of all lights 

 10pts  ADA Bathroom layout Plan and Interior Elevations, fixtures and all materials 

 10pts  Small Kitchen layout and interior Elevations with all appliances and materials 

 10pts  3-Dimentional images (interior and exterior) and model. 

 100pts 

Presentations are set up for December 16th and 18th.