Tuesday December 17th Sonia Oliver Jessica N. Farai Diane Imner Ellesse Jessica M. Jeffrey (Mongjian) Thursday December 19th Zoey Ashley Christopher Alicia Jamaisi Bryam James Garcelle Erick
Final Presentations
Final Presentations December 17th and 19th – 230-530 Detail Studies (22 x 60″) format First Sheet – current format as per standard Second Sheet – larger details – groups of 4 including isometric Power Point Presentation Highlights Assembly Process Highlights – Structure/Thermal/Waterproofing/Fire Proofing Cover Sheet with Drawings List (graded submission) A-100 series Floor plans with […]
Farai Matangira Research
Copper Rainscreen Drawing Files Copper Rainscreen Option 2 Copper Panel Detail Library Parapet Detail
Paul King Research
Link to Terra Cotta Details http://imiweb.org/wp-content/uploads/2015/10/11.030.0211.pdf Youtube Boston Valley Terra cotta Installation
USGS Wall Assemblies
Be certain to create walls of appropriate thicknesses based on the fire ratings required https://www.usg.com/content/usgcom/en/design-studio.html Select a 1 hour rated wall Select a 2 hour rated shaft wall Select an unrated wall Using generic walls layout 1 architectural floor plan Upload as a progress grade
Progress Submission for Architecture – Due Wednesday evening 10/23 – tomorrow
Review the two PowerPoint presentations on stairs and egress 07.1 Cores & Stairs 07.2 Stairs & Egress Review your building plan and elevations and answer the following questions: Where does my fresh air come into my building On the plan count and locate Your Elevators Your Mechanical Shafts Your Stairs Estimate the travel distance between […]
Graded Submission for Structure – Due Monday evening 10/28
Structural Set – Cover sheet with Drawings list and perspective Foundation Plan – shows footings Two other levels (1st and 2nd) Roof Plan Two Structural Sections (longitudinal/lateral) – may be one or two sheets depending on your building I will make a new place to upload this on Blackboard and will rename the current upload […]
Rain Screen Information
http://imiweb.org/11-030-0211-terra-cotta-rainscreen-3d-view-cmu-backup-insulation/ https://bostonvalley.com/resources/ For Research
Progress Drawing deadline for Monday October 14th
For this presentation focus on the layout of your structural drawings. Also begin to layout interior walls on one of your floorplans – Be prepared to work in class – Upload your progress Revit file by Midnight Monday October 14th
Revit Progress for Next Class
Continue to work on sheet layout Use Duplicate view and duplicate as dependent as needed Rotate the plan if needed – rotate project north Develop a sheet numbering system. Create 10 sheets and title and number these. Rotate Elevations as needed – I will post how separately Add concrete columns From First Floor to Basement […]
Current Assignments
We have no classes the next two Tuesdays. Both of these assignments are due to be uploaded by Wednesday evening Oct 2nd. You have all chosen to present on the same day so we will spend the entire class on the materials presentations. You still must complete and upload the Revit Progress set – both […]
Connections Assignment Grades are Posted
Here are the statistics / Check blackboard for your grade.
Board Photos 9/24
Grid & Levels due for Next Class
Progress Grade = you must demonstrate and attempt to complete this assignment. For your selected building complete the following and upload your progress Revit file by midnight Wednesday on Blackboard – Add Required Levels Set Heights Modify Names Add Grids Level A,B,C & 1,2,3 as needed Set Spacing Add Dimension Strings Distance from grid to […]
Current Assignment
Be prepared to begin to draw your buildings grid on Tuesday. You need to figure out dimensions and levels. Go to http://www.oasisnyc.net/map.aspx and locate your block and lot # – this follow through the links to the tax map and you will be able to find the dimension of your site. Figure out the dimensions […]