Monthly Archives: February 2015

Initial Zoning Sheet (Rough Draft)

Posted in Uncategorized | Leave a comment

First Zoning Progress

Posted in Melanie louie | Leave a comment

Zonning.

Posted in Edwin Vega, Work Distribution | Leave a comment

Site Photos

Posted in Tatiana Zheludkova, Uncategorized | Leave a comment

Final project review Jay st.

Posted in 04 – Project Review, Edwin Vega | 1 Comment

Project 1 files

Link for Dropbox: https://www.dropbox.com/s/215o5r36hjzezv6/F2013%20ARCH2410%20THE%20JAY%20ST.%20HEALTH%20CLUB%2040X60.pdf?dl=0 https://www.dropbox.com/s/215o5r36hjzezv6/F2013%20ARCH2410%20THE%20JAY%20ST.%20HEALTH%20CLUB%2040X60.pdf?dl=0

Posted in 04 – Project Review, Work Distribution | Leave a comment

04 – Project Review Work Distribution.

01. Edwin will do Structural Review. 02. Osei will do Mechanical Review. 03. Tatiana will do Program Review. 04. Melanie will do Room Name and Numbering System . 05. Nicolas will do Egress Study.  

Posted in Work Distribution | 1 Comment

Nicolas’s Schedule

Posted in 02 – Your Schedule, Nicolas Chamorro | Leave a comment

Team Schedule

We will meet on Monday by skype or teamSpeak or by texting. We will meet as a full group in person on Thursday.  

Posted in 03 – Team Schedule, Team Schedule | Leave a comment

Meet Edwin

Team Members: Edwin Vega Why Did He Choose Architecture? His passion for architecture begun when he was studying Civil engineering. As the time passed, He changed his points of view of engineering, so that He can follow his passion for … Continue reading

Posted in 01 – Team Interviews and Website, Edwin Vega | Leave a comment