Video Research Assignment.

Neolith  Facade systems

Opaque Material – Hc System Installation.

  • 0:20 – Thermal insulation
  • 0:25 – Energy saving
  • 0:28- Impermeability
  • 0:32- Insulation
  • 0:37- Planning and measurements.
  • 1:05-Bracket and Thermal Insulation Installation.
  • 1:23-Hc system Installation.
  • 2:03-End of Hc System installation.

Glass Curtain Wall

  • 0:12-fins
  • 0:36-point fixed Facade.
  • 1:26-point fixed fittings.

Case Study

Glass curtain wall system

1st Option

http://www.sotawall.com/wp-content/uploads/2015/01/sotawall-Brochure-HW-2015.pdf

http://www.sotawall.com/product/hybrid-wall/

Case Study Building

http://www.sotawall.com/project/1269-lexington-avenue/

2nd Option

https://www.pilkington.com/en/us/products/product-categories/glass-systems/pilkington-planar

Case study Building

https://projects.pilkington.com/show/8737/City-Library-Turku-Finland.aspx

Plan and sections of the building.

https://www.archdaily.com/11731/turku-city-library-jkmm-architects

Opaque facade system

1st Option

https://www.triton-ca.com/neolith-sintered-stone-facade

https://static1.squarespace.com/static/5af4ac65da02bcf5a92d1629/t/5af79f68758d46b9d41a9919/1526177661909/es_00022_archivo_pdf_75565.pdf

Case study building

https://www.pepperconstruction.com/stories/creating-sustainable-home-chicago-childrens-theatre

https://wkarch.com/catalog/chicago-childrens-theatre/

2nd Option

https://www.triton-ca.com/dridesign

http://www.dri-design.com/wp-content/uploads/2018/02/Design-Guide-2018-all-pages-2-19-18-.pdf

Case study building

https://www.dri-design.com/details-specs/access-details/