Curtain Wall Components Installation T= 2 End at 41
Category: Technical
Opaque Material – Rain screen / Cladding Systems
Rain screen / Cladding Systems Start T=30 End at 205.
- 30 Shows the cassettes being mechanically folded from one piece of metal with a self-draining-gutter
- 55 Shows the PPC – Polyester Coating
- 109 Metallic, standard, and textured to any RAL or BS color
- 119 Installed over insulated panel
- 125 Shows first cassette being hooked on the J rail then fixed to the panel
- 133 Subsequent cassettes hook into the neighbor
- 152 Showing the different design cassettes.
- 205 End Here
Junhao Tan-Opaque Material
- 0:12 – Wall Assembly
- 0:40 – Secret fix on the back of TUF-S
- 1:06 – Detail info
Eduardo Ramirez Wall component videos
Start time 0:14 seconds
Starting time 1:11 seconds
video research Win Myint Aung
Opaque wall
Cable Curtain wall
Stick Curtain Wall Assembly
Timestamps: NOTE WATCH VIDEO @ 2X Speed
- 0:20 – 0:35 Steel to Concrete Connection
- 0:41 – Exterior Mullion Assembly
- 1:00 – Horizontal to Vertical Connection
- 1:20 – 1:30 – Gasket Installation
- 1:40 – Lift of mullion onto the concrete slab
- 2:00 – Use of appropriate Hardware
- 2:42 – Installation of Glazing
- 3:17 – Corner Installation
- 3:30 – Installation of Window Sill
- Remainder show window disassembly
Technical – Building a metal stud wall
J Sherman_Research Index Btech III
Dear students:
Please see link below for the video research and posting from 4/14 class.