Final Submission for Connections Assignment

This is your final submission.  Be certain of the following:

  • Upload both your Revit File and a Single PDF to Blackboard
  • Your Revit file will contain all of your families – so you do not need to upload these separately
  • Print the first sheet as 11 x 17 and the second detail sheet as 22 x 34 – full size.

The second sheet is more important than the first one.  I expect most of you to have a very similar first sheet.  This sheet will show your entire updated model – with keys for callouts showing details shown on the second page.  A final submission that includes only the first sheet will not receive a grade better than a C – which is minimally passing.

The majority of your grade is based on the work you show on the second sheet as well as my review of the construction of your Revit file.  For the second sheet you must include the following:

  • Larger Scale callouts of specific connections (for example the footing to baseplate connection)
  • This specific detail study would require matching and aligned plans and one section.  In this specific case only 1 view other than the plan is needed as additional elevations or sections do not show any additional information.  For this view the section should be cut through the center of the hold down bolts.
  • Typically for other details you are showing you will need a plan view and two other (section or elevation views) plus an isometric.
    • Always include an isometric for each study
    • Images should not display shaded – but as hidden lines.
    • Always include Annotation (Notes with Leaders and Dimensions)
    • Where appropriate add “detail items” to show materials or add the “break line”
    • In your families assign proper materials so they show properly in section
  • Add a drawings list into your titleblock above the sheet number/name area.  This “view” can be put on more than one sheet – so put it on both.
  • It is OK to create more detail sheets if necessary.

Careful of over constraining a model

In the example above the student received a conflict message that the model was over-constrained when trying to adjust the parameters for depth or width.  This was related to the second set of reference planes put in place to move the locations of the bolts when the parameters were adjusted.

In this instance the student has locked the the 4″ dimensions correctly but has also locked the second set of reference planes – which then cannot move.  When the depth or width is modified the locked 4″ constraint attempts to move the reference planes – but as these are locked there is a conflict and the error results.

Be certain only to lock the 4″ dimension and
not the secondary reference planes.

Reminder of two deadlines for Tuesday – all posted by Monday midnight – do not be late!

  • Connections Assignment (3A.3 Steel Connections First Draft 3)
  • Post your progress for the connections assignment to blackboard – Revit file and PDF
    • First sheet updated (do not print or plot this sheet)
    • Second details sheet (plot this one – 22 x 34 large size)
      • Like the scavenger hunt details assignment focus on the development of details of the connections of beams/columns/footing.
      • Remember to always have the 4 view s- Plan/2 Elevations or Section combo, and 1 isometric.  Add Annotation, Notes and Dimensions, Add materials or detail items as needed.
  • Case study building group presentation (1A.2 Case Study Team Presentation)
  • This is a team effort – all members must contribute.
  • Follow the outline provided (follow this link)
  • Please put your initials on any slide you contributed to.
  • Only 1 member of the team needs to upload the PowerPoint – please make sure that the last names of each team member is in the file name.  Add a comment when you upload- listing the names of your team members.  Whatever format you use please convert and upload a PDF to blackboard.
  • File Name – CaseStudy-BldgName-TeamMemberNames.PDF

Case Study Slides Outline

  • Cover Sheet with Team Member Names & Photos
  • Location/Architect/Year Built/Client
  • Grid location and dimensions
  • Floor to Floor dimensions
  • Location of central core
  • Location of stairs and egress plan
  • Exterior Facade Materials
  • Interior Ceilings – Lighting and Ventilation System
  • Interior Materials and Furnishing
    • (remember to cite your sources!!!)
    • (Add initials of each student who contributes to a given slide – in the corner)

Please finalize your Case Study Selection

Each of you will need to finalize your case study selections.  It will be best if you work in teams of 2 to 3 on a building.  You will be able to share your research but you will each draw separately.  Drawing files or Revit Project files and families may not be shared.  There will be a case study team presentations next week.

https://openlab.citytech.cuny.edu/ar2431btech3sp20profking/resources/case-study-buildings/

Scavenger Hunt Best Sheet Grade

Please note that there are two columns for grade statistics.  The first column is based on the work shown at pinup. 5  student grades were lowered due to lateness of posting your files on Blackboard.

This included 2 students with A- grades (lowered to B+), 3 students with B grades (lowered to B-) and one B- grade (lowered to C+)

The second grade column  statistics after the grades were lowered.

It is important that you meet this deadline and that you submit on time.

Current Deadline Clarifications

Scavenger Hunt Best Sheet:

For the Scavenger Hunt Best Sheet plot full size 22 x 34. This is to include annotation (notes & dimensions) with detail items and hatch patterns.  This should be posted to Blackboard as both a PDF and your Revit file.  You are plotting just this one sheet – no cover etc.

Steel Connections Assignment:

For the connections assignment – you do not need to print as we have just started this assignment. You are only required to upload this to blackboard and bring in your file for us to continue working.  Upload your Revit file and an 11 x 17 PDF of your sheet layout.