Reminder of two deadlines for Tuesday – all posted by Monday midnight – do not be late!

  • Connections Assignment (3A.3 Steel Connections First Draft 3)
  • Post your progress for the connections assignment to blackboard – Revit file and PDF
    • First sheet updated (do not print or plot this sheet)
    • Second details sheet (plot this one – 22 x 34 large size)
      • Like the scavenger hunt details assignment focus on the development of details of the connections of beams/columns/footing.
      • Remember to always have the 4 view s- Plan/2 Elevations or Section combo, and 1 isometric.  Add Annotation, Notes and Dimensions, Add materials or detail items as needed.
  • Case study building group presentation (1A.2 Case Study Team Presentation)
  • This is a team effort – all members must contribute.
  • Follow the outline provided (follow this link)
  • Please put your initials on any slide you contributed to.
  • Only 1 member of the team needs to upload the PowerPoint – please make sure that the last names of each team member is in the file name.  Add a comment when you upload- listing the names of your team members.  Whatever format you use please convert and upload a PDF to blackboard.
  • File Name – CaseStudy-BldgName-TeamMemberNames.PDF