Neolith Facade systems
Opaque Material – Hc System Installation.
- 0:20 – Thermal insulation
- 0:25 – Energy saving
- 0:28- Impermeability
- 0:32- Insulation
- 0:37- Planning and measurements.
- 1:05-Bracket and Thermal Insulation Installation.
- 1:23-Hc system Installation.
- 2:03-End of Hc System installation.
Glass Curtain Wall
- 0:12-fins
- 0:36-point fixed Facade.
- 1:26-point fixed fittings.