Allface RainScreen Cladding System

  • Allface System F1.10 (Rainscreen Cladding) Start t=110 watch to 5:30
      • 38      Drawing showing layout of wall connectors
      • 110     Straight Level Line to locate angles
      • 112     Anchor Positions
      • 118    Pre-Drill Holes using Masonry Drill Bit
      • 142   Installation of 2 bolt aluminum angles
      • 150   Installation of 1 bolt aluminum angles
      • 205   Shows installed angles
      • 210   Installation of Mineral Wool “Rockwool” “Roxul” insulation with fasterners
      • 250   Installation of vertical “T” channels – angle clips allow for adjustment
      • 258   Screws into holes for fixed connection to T
      • 310   Screws into slotted connections for moveable connection to T – allows for movement due to expansion & contraction
      • 325   Note “Black” material between aluminum angle and concrete as a thermal break
      • 340   Next set of vertical “T” channels installed.  Note space to allow for expansion and contraction.
      • 420   Installation of Panels
      • 436   Spacers to maintain equal joints between panels
      • 443   Location of connection points on panels – note fixed positions vs moveable
      • 445   Pre-drilled holes in panels are visible
      • 450   Drill holes in aluminum T aligned with panel holes
      • 457   Installation of Blind Rivets –
      • 528   Diagram showing fixed and moveable rivet locations
      • 533    Shows how adjustable faster works – hole is bigger than Rivet
      • 550   Stop video here

Leave a Reply

Your email address will not be published. Required fields are marked *