HALFEN – Fixing Systems – Curtain Wall to Concrete

  • halfen.com website fixing-systems
  • HALFEN Curtain Wall Connector Edge of Slab Start t=28 watch to 1:32
      • 28      View of Wood formwork for Concrete Slab
      • 35      Channel nailed to wood formwork
      • 40      Reinforcing rebars for slab and pouring of concrete
      • 48      Form work removed & styrofoam removed from channel
      • 53       Parallelogram headed bolts inserted – rotate as tightened
      • 57       Paired aluminum angles w/slots for vertical & horizontal motion
      • 107     Square washer & bolt
      • 110     Vertical mullion of curtain wall
      • 112     Bolting of mullion to edge of slab angles
      • 120     Overall view of curtain wall system
      • 126    Halfen Edge of Slab Assembly

  • HALFEN Curtain Wall Connector Top of Slab Start t=25 watch to 2:08
      • 25      Setting Form work with channel
      • 45      Pouring Concrete Slab
      • 100    Shows recess in slab after formwork is removed
      • 114     Shows J-connector Plate bolted to channel
      • 125     Shows Curtain Wall Connected to J-Connector Plate
      • 148    Show installation of Fire Safing/Stopping
      • 154    Show application of Smoke Seal (Red)
      • 208   Stop watching here

  • HALFEN Curtain Wall Connector Top of Slab Start  t=20 watch to 2:15
    Shows Unitized Curtain Wall Installation using Top Connector

      • 20      Setting the channel in the formwork – flush to top of slab
      • 25      Pouring Concrete Slab
      • 111     Shows J-connector Plate bolted to channel
      • 123    Unitized Curtainwall panels lowered into place
      • 145    Panel Hook connected to J-Plate
      • 156    Next Panel lowered and connected to previous panel
      • 215   Stop watching here