- halfen.com website fixing-systems
- HALFEN Curtain Wall Connector Edge of Slab Start t=28 watch to 1:32
-
- 28 View of Wood formwork for Concrete Slab
- 35 Channel nailed to wood formwork
- 40 Reinforcing rebars for slab and pouring of concrete
- 48 Form work removed & styrofoam removed from channel
- 53 Parallelogram headed bolts inserted – rotate as tightened
- 57 Paired aluminum angles w/slots for vertical & horizontal motion
- 107 Square washer & bolt
- 110 Vertical mullion of curtain wall
- 112 Bolting of mullion to edge of slab angles
- 120 Overall view of curtain wall system
- 126 Halfen Edge of Slab Assembly
- HALFEN Curtain Wall Connector Top of Slab Start t=25 watch to 2:08
-
- 25 Setting Form work with channel
- 45 Pouring Concrete Slab
- 100 Shows recess in slab after formwork is removed
- 114 Shows J-connector Plate bolted to channel
- 125 Shows Curtain Wall Connected to J-Connector Plate
- 148 Show installation of Fire Safing/Stopping
- 154 Show application of Smoke Seal (Red)
- 208 Stop watching here
- HALFEN Curtain Wall Connector Top of Slab Start t=20 watch to 2:15
Shows Unitized Curtain Wall Installation using Top Connector
-
- 20 Setting the channel in the formwork – flush to top of slab
- 25 Pouring Concrete Slab
- 111 Shows J-connector Plate bolted to channel
- 123 Unitized Curtainwall panels lowered into place
- 145 Panel Hook connected to J-Plate
- 156 Next Panel lowered and connected to previous panel
- 215 Stop watching here