Skip to content
- Complete the structural portions of your building
- Concrete
- Foundation Wall and Footing (basement to level 1)
- Isolated concrete footings and column (below slab to slab)
- Foundation Slab
- Steel
- Interior Columns – Basement to roof (have a joint 3 feet above level 2)
- Perimeter Columns – Start at Level 1 to roof
- Steel Columns (level 1 to roof) Remember to set -5″ Z height
- Show column tags
- Floors
- 3″ LW concrete on 2″ metal deck (level 1 to roof)
- Exterior Wall
- Add a placeholder wall – Level 1 to Parapet
- Plan development – study your entry level plan. Work out the dimensions of the different walls and be prepared to draw in class.