Post 3

Team 1: Rinaldis Movers: Time = 8 Mins Left / Spent = $8.36

Team 2: We Move Stuff: Time = 9 Mins Left / Spent = $6.75

Team 3: Non Labeled: Time = 8 Mins Left / Spent = $10.74

Team 4: Ship’n & Truck’n: 7.5 Mins Left / Spent = $4.23

Team 5: From Here to There: 4 Mins Left / Spent = $4.24

Most Important Problem:

-How big is the bread.

-Cost efficiency.

-Instructions simple and effective.

-Tools and materials.

Looking Back:

-No one would change their problem definition.

-Time spent making instructions.

-Left little things out while focusing more on the bigger issue.

-What is necessary and what isn’t.

Disagreements:

-Minor misunderstandings.

-Instructions not read clearly.

-Tested out spoon vs. knife.

ANALYSIS

Same As The Real Thing:

-Time and cost fitting things into truck

-How much forgetting 1 or 2 things can cost you

-Cost time and money to resend but having to do what you can do with what you have.

-Communication protocol.

Different From The Real Thing:

-Safety wasn’t a big concern.

-Another person to presentation and assembly.

-Unlimited labor for free.

-The truck wasn’t real.

-Damages.

-Transporting for long distances.

-Didn’t have a client or designer.

-Sometimes there is a representative from the shop at the theater.

APPLICATION

What Did You Learn:

-Kept telling us to assume that a robot isn’t reading the instructions but assume they’ve never made a sandwich.

-Drawings and instructions vary by crews.

-Shared resources, keeping a tight loop of people and feedback. Efficiency to keep in mind.

-We were working to a common goal.

-Working outside your comfort zone.

-Simple made it less stressful, were in a real production small mistakes can set everyone back.

 

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *