Team 1: Rinaldis Movers: Time = 8 Mins Left / Spent = $8.36
Team 2: We Move Stuff: Time = 9 Mins Left / Spent = $6.75
Team 3: Non Labeled: Time = 8 Mins Left / Spent = $10.74
Team 4: Ship’n & Truck’n: 7.5 Mins Left / Spent = $4.23
Team 5: From Here to There: 4 Mins Left / Spent = $4.24
Most Important Problem:
-How big is the bread.
-Cost efficiency.
-Instructions simple and effective.
-Tools and materials.
Looking Back:
-No one would change their problem definition.
-Time spent making instructions.
-Left little things out while focusing more on the bigger issue.
-What is necessary and what isn’t.
Disagreements:
-Minor misunderstandings.
-Instructions not read clearly.
-Tested out spoon vs. knife.
ANALYSIS
Same As The Real Thing:
-Time and cost fitting things into truck
-How much forgetting 1 or 2 things can cost you
-Cost time and money to resend but having to do what you can do with what you have.
-Communication protocol.
Different From The Real Thing:
-Safety wasn’t a big concern.
-Another person to presentation and assembly.
-Unlimited labor for free.
-The truck wasn’t real.
-Damages.
-Transporting for long distances.
-Didn’t have a client or designer.
-Sometimes there is a representative from the shop at the theater.
APPLICATION
What Did You Learn:
-Kept telling us to assume that a robot isn’t reading the instructions but assume they’ve never made a sandwich.
-Drawings and instructions vary by crews.
-Shared resources, keeping a tight loop of people and feedback. Efficiency to keep in mind.
-We were working to a common goal.
-Working outside your comfort zone.
-Simple made it less stressful, were in a real production small mistakes can set everyone back.