Brief list of topics to be covered:
Week 1—Measurements for the top section
Week 2—Measurements for the top section
Week 3—Making holes on the top section
Week 4— Putting parts on the top section
Week 5—Measurement for the bottom section and finish making the holes
Week 6—Putting parts on the PC Board
Week 7—Soldering the PC Board and cutting the long silver legs
Week 8—Toggle & Momentary switch setup and L.E.D setup
Week 9—Toggle & Momentary switch setup and L.E.D setup
Week 10—Rainbow cable setup: 14 Pin
Week 11—Rainbow cable setup: 14 Pin
Week 12—Rainbow cable setup: 16 Pin
Week 13—Rainbow cable setup: 16 Pin
Week 14—Final assembly (Transformer and power cable setup) and testing
Week 15—Final assembly (Transformer and power cable setup) and testing