Above we see the initial installation of the window wall on this new residential building in Brooklyn. This view shows the base of the building, which has a more transparent envelop than the main tower of the building. The window wall installs between the slabs. The subsequent levels of window wall include an insulated slab edge cover.

In the view below we see the installation progressing. A track is visible that is installed to the underside of the upper slab to secure the top of each floor’s window wall. The lower edge of the window wall locks into the previously installed units on the floor below.