Videos Installation – Estarlin De La Rosa

Equitone Installation

 

0:00 Explanation               0:26 Tools          3:27 Luko     4:25 Drilling Equitone

5:11 Equitone on a metal frame            5:46 Visible rivet fixing

6:34 Fixed point- griping point          7:50 Sequence for mounting the panel

10:01 Equitone Natura, Natura pro, picture textural

13:05 Equitone fixed on timber              13:49 Equitone Natura and textural

14:21 Equitone Natura pro and pictura               14:42 Equitone tectiva

15:28 Horizontal joint profile             16:19 Invisible adhesive fixing

16:50 Tergo secret fix        17:43 Hanging hook           18:07 Supporting frames

Unitized Curtainwall

0:14  Surveying       0:48   Unloading      1:28 loading       2:08 Inspection

2:58  Installing the rail       3:00 Sealant       4:05 Seatting of chicken head

4:21  Alignment       4:53  Installation      7:40  Spider crane       8:14  Setting

EQUITONE Facade Panel Installation – Unitized Curtain Wall Installation

  • 0:07 EQUITONE panels visible installation system with rivet or screw
  • 0:09 Invisible fixing method with adhesive
  • 5:13 – 5:28 How rivet works
  • 6:09 The position of the rivet holes on the panel
  • 6:57 Panels on metal supporting frame with fixed and gliding points
  • 7:21 location of fixed points
  • 7:45 Rivet with sleeve for fixed points and without sleeve for gliding points
  • 7:55 Supporting metal frame with anchor points
  • 9:25 Measurement of panel placement
  • 11: 31 Foam  tape on the metal frame
  • 15: The position of horizontal aluminium joint profile
  • 16:43 Invisible adhesive fixing of panels ( supporting frame with foam and adhesive)
  • 17:28 Tergo secret fixing method (Half drilled panel with anchor, metal hook, washer and bolt)
  • 17:44 Hanging Hook system ( hanging hooks on the back of the panel)
  • 18:00 Adjustable top hanging hook

 

  • 2:14 lifted up curtain wall unit ready to be placed into the installed curtain wall frame