Facade panel and Curtain wall installation

Trespa panel

  • :20 Tools
  • 1:24-2:04 insure panel handling and safety
  • 2:14 anchor points of panels
  • 2:20-2:54 fixed and sliding points with drill bit size
  • 3:03 anchor points and fixed distances
  • 3:30-3:44 installation of layers
  • 3:51-4:16 distancing of panels from wall and other objects
  • 4:29-4:35 panel requirements
  • 4:44-4:57 corner requirement

Kawneer curtain wall

 

 

  • 1:56 circuit of assembly
  • 2:15 assembly of window and glass framing
  • 2:35 assembly of window fasteners to building
  • 3:08 thermal durability
  • 3:15 fire resistance
  • 3:25 window durability
  • 4:00 active fail safe