Trespa panel
- :20 Tools
- 1:24-2:04 insure panel handling and safety
- 2:14 anchor points of panels
- 2:20-2:54 fixed and sliding points with drill bit size
- 3:03 anchor points and fixed distances
- 3:30-3:44 installation of layers
- 3:51-4:16 distancing of panels from wall and other objects
- 4:29-4:35 panel requirements
- 4:44-4:57 corner requirement
Kawneer curtain wall
- 1:56 circuit of assembly
- 2:15 assembly of window and glass framing
- 2:35 assembly of window fasteners to building
- 3:08 thermal durability
- 3:15 fire resistance
- 3:25 window durability
- 4:00 active fail safe