Stick Curtain Wall Assembly

Timestamps: NOTE WATCH VIDEO @ 2X Speed

  • 0:20 – 0:35 Steel to Concrete Connection
  • 0:41 – Exterior Mullion Assembly
  • 1:00 – Horizontal to Vertical Connection
  • 1:20 – 1:30 – Gasket Installation
  • 1:40 – Lift of mullion onto the concrete slab
  • 2:00 – Use of appropriate Hardware
  • 2:42 – Installation of Glazing
  • 3:17 – Corner Installation
  • 3:30 – Installation of Window Sill
  • Remainder show window disassembly

Leave a Reply

Your email address will not be published. Required fields are marked *