INSTALLATION VIDEOS-TENLY LAW

TIME STAMPS:

0:03-0:12 SPIDER CLIP ASSEMBLY

0:16-0:26 GLASS PANEL ASSEMBLY

0:28-0:53 GLASS PANEL AND SPIDER INSTALLATION ASSEMBLY

TIME STAMPS:

1:36-2:35 STEEL FRAME INSTALLATION

2:42-2:53 LOWER STEEL WALL INSTALLATION

2:55-3:15 MORE STEEL FRAME INSTALLATION

3:17-6:06 REPITITION OF STEEL FRAME AND STEEL WALL PANEL INSTALLATION

Leave a Reply

Your email address will not be published. Required fields are marked *