Ventilated Facade Instalation

HILTI- Ventilated Facade System

  • Time Stamps:
  • 1:00 – Installation of L Bracket to Wall
  • 1:30 – Masonry Anchor
  • 2:07 – Different Assembly Connections
  • 2:20 – Anti Rust Coating
  • 4:05 – Rockwool Insulation
  • 4:13 – Installation of Hanger for Insulation
  • 4:40 – Installation of T-Plate
  • 5:05 – Installation of screws

 