Desktop Startup Guide

Check List

___________________________________________________

Radiator 1       |   Water Leak       |  No Leak ✔

___________________________________________________

Radiator 2      |   Water Leak        |  No Leak ✔

___________________________________________________

Water Tank   |  Water Leak         |  No Leak ✔

___________________________________________________

Pump               |  No Operation     | Operation  ✔

___________________________________________________

Pipes                |       Damage           |  No Damage ✔

____________________________________________________

Cold Fans (9) |  No Operation  (1/9)| Operation  (8/9) ✔

_____________________________________________________

When everything is all set, the desktop is ready to go.

I builded this 45ILBS water cooling desktop at 2017. It took me 2days to design the look, and about 3 days to build it.

The purpose why I am building a water cooling desktop. This is proof that I can mastery the technique of water cooling system, so that I can get orders from customers.