https://drive.google.com/open?id=1nzKTSJ4eCBl4AKLAwhkKR94ZN6vlXLKn
Desktop Startup Guide
Check List
___________________________________________________
Radiator 1 | Water Leak | No Leak ✔
___________________________________________________
Radiator 2 | Water Leak | No Leak ✔
___________________________________________________
Water Tank | Water Leak | No Leak ✔
___________________________________________________
Pump | No Operation | Operation ✔
___________________________________________________
Pipes | Damage | No Damage ✔
____________________________________________________
Cold Fans (9) | No Operation (1/9)| Operation (8/9) ✔
_____________________________________________________
When everything is all set, the desktop is ready to go.
I builded this 45ILBS water cooling desktop at 2017. It took me 2days to design the look, and about 3 days to build it.
The purpose why I am building a water cooling desktop. This is proof that I can mastery the technique of water cooling system, so that I can get orders from customers.