DREAM TEAM // A Case Study in Steel Connections

active 1 month, 3 weeks ago
DREAM TEAM // A Case Study in Steel Connections
This Project is OPEN.
School / Office
Technology & Design
Department
Architectural Technology
Category
College, Student
Project Description

CASE STUDY OF THE MARITIME HOTEL/DREAM HOTEL BY HANDEL ARCHITECTS

Project Contact

Acknowledgements

This project was created by: Thomas Kae Lui

Recent Posts

Precast Concrete Wall System

From interior to exterior a precast concrete wall begins with a group of layers consisting of a […] See MorePrecast Concrete Wall System

Composite Metal Panel Connections

A composite metal panel can be a “rain screen pressure equalized dry-joint system” meaning it ser […] See MoreComposite Metal Panel Connections

Recent Comments

Comment on "Case Study Assignment 1"

I need this case study right now I'm a college student See MoreComment on "Case Study Assignment 1"

Comment on "Concrete Wall (Research)"

Veranda zemin kaplamaları, ahşap veranda zemin, bahçe zemin, ahşap zemin, zemin, zemin mal […] See MoreComment on "Concrete Wall (Research)"

Comment on "Concrete Wall (Research)"

2022 ve 2023 vizyon filmlerin tek adresin hd film izleme sitesi See MoreComment on "Concrete Wall (Research)"

Recent Discussions

Sorry, there were no discussion topics found.

Recent Docs

No Recent Docs