Cut frame of metal.
Monthly Archives: June 2014
Day 6
Continue work on screen
1) Conference Registration
2) Reservation of Bus trip
Day 5
Work on Essay
Work on Screen
Day 4
Worked on essay for scholarship. Continue with screen on Thursday
Day 3
Received screen-
Discussion on how to attach screen and charge battery for tools
1008 Carbon Steel diamond grate
Plexiglass sheet
Testing which material to choose: plexiglass, steel mesh, or both.
Set up laboratory
Discussed schedule, poster presentation
Day 2
Decided on materials for screen (steel grate and plexiglass screen)
Ordered screen
Discussed possible new design for grate
Discussed Gordon Research Conference during week of 21st of July
Discussed “College Now” Program for week of 14th of July
http://www.grc.org/programs.aspx?year=2014&program=granular
http://www.mcmaster.com/#expanded-metal/=sck0xd
1.33″ × 3.20″ | 0.110″ | 1.00″ × 2.56″ | 0.175″ | 0.110″ | 9302T176 | 13.60 | 9302T94 | 31.42 | 9302T25 | 55.11 |
http://www.mcmaster.com/#cast-acrylic/=sckeq6
1/8“ | +0.015″, -0.025″ | 8560K263 | 76.73 |
Day 1
Created schedule
Discussed overview of renewable energy
Cleaned up laboratory
Created Open Lab web site
Schedule
9-Jun Monday-Create Schedule and Introduction to renewable energy
10-Jun Tuesday-Check and order screen
16-Jun Monday-Setup laboratory. Prepare poster presentation
17-Jun Tuesday-Setup laboratory. Prepare poster presentation
19-Jun Thursday
24-Jun Tuesday-Installing screen
26-Jun Thursday
30-Jun Monday-Installing screen
1-July Tuesday- prepare poster presentation
7-July Monday-prepare poster presentation
8-July Tuesday-prepare poster presentation, 3D model of combustion chamber
10-July Thursday-continue connecting motor to wormgear
July14-16: CLT work for Professor Nakamura for College Now program
July 17- Trip to Toyota Factory
July 19-20: Gordon Research Conference for Granular and Granular Flow
July 21,22,24: Continue work on physical model.