This is a sketch of the ERV {heat recovery ventilation} system that should be hard lined over your plan. Complete the key and described each of the elements in your HVAC plan.
Categories
-
Recent Posts
Recent Comments
Archives
Meta
This is a sketch of the ERV {heat recovery ventilation} system that should be hard lined over your plan. Complete the key and described each of the elements in your HVAC plan.
Do you want us to do 3 separate 3D files for each floor plan or do we make them and just join them all at once under one file?
You should have one 3-D model file or 2-D drawing which is a projection. Place a view of the 3-D model on to your title block and print the 3-D view with title block as a pdf as part of your submission.
You may for extra credit include other views of your models of the case study project. But first focus on the accuracy and depth of information on your required submissions.
Question: Why are my lines going all over the place when I switched to pay-per-view from model?
Your model space drawings were created with three-dimensional information, you are actually drawing in a 45° view. So when you switch to a straight top view in your paper space view the drawing became distorted. Notice the view orientation boxes in the top right-hand corner.
Note you should dimension the grid lines not the column widths in your grid drawing.
Welcome
to the 2018 fall semester
of
Building Technology 2
Here you should find the resources including video tutorials, reference material, and readings for you are Architecture classes here.