Class date | Lecture Schedule | Readings | Assignments |
Monday, 06, 1, 2020 | 01 Introduction – Collect names and pictures of students, assign logo for titleblock -Introduce Module A (existing building documentation and grid) |
Ching, Building Construction Illustrated, Chapter 1, pp. 1.02-1.06, Chapter 2, pp. 2.02-2.30, Chapter 12, pp. 12.02-12.05, 12.08-12.09 |
A01 Site Maps <-Intro [site, plan and grid] |
02 Grids – Introduction to grids, explain scale and linetype in CAD |
|||
Tuesday, 06, 2, 2020 | 03 Print – Introduction to lineweights, ctb files and layouts in CAD |
A01 Site Maps ->DUE A02 Plans and Elevations Introduce Assignment A2 (Plans and Elevations) |
|
Wednesday, 06, 3, 2020 | 04 XREF s Elvations & Sections – Desk crits |
||
05 Concrete, Mix -Desk crits elevations & sections |
A02 Plans and Elevations –>due | ||
Thursday, 06, 4, 2020 | 06 elevations & sections – Drawing standards (see #16) – Desk crits, open questions |
Allen and Iano, Concrete Construction Chapter 13, pp. 515-551 Ching, Building Construction Illustrated, |
Sketchbook check complete / incomplete |
07 Concrete (cast in place) – Desk crits, open questions |
Allen and Iano, Sitecast Concrete Framing Systems Chapter 14, pp. 565-599 Ching, Building Construction Illustrated, |
A03 Pin-up | |
Monday, 06, 8, 2020 | 09 Foundations – Desk crits, open questions |
Allen and Iano, Foundations Chapter 2, pp. 29-38, pp. 56-71 Ching, Building Construction Illustrated, |
|
15 Drawing standards to 06 | |||
Tuesday, 06, 9, 2020 | 10 DURA (Solar Decathlon project) – Desk crits, open questions [Module A complete] – sketchbook review including readings and desk crits |
Sketchbook Grated 1 0f 4 Assigned: B01 Reference material |
|
Assignment A4 due | A04 Final Module A ->due | ||
Wednesday, 06, 10, 2020 | 11 Wood – Desk crits, open questions |
Readings: Chapter 3, Pages 84 – 127, Fundamentals of Building Construction / Materials & Methods By Edward Allen & John Wiley (5th Edition) |
B01 Reference material -> due Introduce B02 In class basement and ground floor plans |
12 Foundation Calculations | B02a In class –> due basement and ground floor plans Introduce B02 all plans Introduce B03 elevations |
||
Thursday, 06, 11, 2020 | 13 Framing types – Desk crits, open questions |
Readings: Chapters 5 and 6 Pages 161 – 253, Fundamentals of Building Construction / Materials & Methods By Edward Allen & John Wiley (5th Edition) |
B02 all plans –> due |
14 Joists – Desk crits, open questions |
Sketchbook Grated 2 0f 4 –> due B03 elevations –> due Introduce B04 Joist Plans |
||
Monday, 06, 15, 2020 | B04 Joist Plans Pin up | ||
16 Studs layout – Desk crits, open questions |
B04 Joist Plans –> due Introduce B05 Stud Plans |
||
Tuesday, 06, 16, 2020 | 17 3D Framing | B05 Stud Plans Pin up Introduce B06 3D Framing |
|
Midterm grades | B05 Stud Plans –> due Introduce B07 Wall sections |
||
Wednesday, 06, 17, 2020 | |||
Thursday, 06, 18, 2020 | 18 Wall sections Part1 – Desk crits, open questions |
B06 3D Framing Pin up | |
19 Wall sections Part2 – Desk crits, open questions |
|||
Monday, 06, 22, 2020 | 20 Roof | ||
Tuesday, 06, 23, 2020 | 21 Stairs | B06 3D Framing –> due | |
22 Building Envelope | |||
Wednesday, 06, 24, 2020 | 26 Mechanical | B07 Wall sections –> due Heavily weighted grade Introduce B07 Wall sections |
|
Thursday, 06, 25, 2020 | 23 Redlining | Module B pinup (all B assignments) | |
Monday, 06, 29, 2020 | Module C – 27 Heavy timber sizing – Desk crits, open questions |
Introduce B08 final (all documents) | |
Tuesday, 06, 30, 2020 | 28 Heavy timber details – Desk crits, open questions |
Introduce Assignment C | |
29 High-tech wood construction – Desk crits, open questions |
|||
Wednesday, 07, 1, 2020 | – Final Examination – C Final Pin Up |
Sketchbook Grated 4 0f 4 –> due | |
Last day of semester | Assignment C –> due |