you team’s zoning analysis was thorough, but it felt unclear. Maybe if you titled what each number is it would be clearer to understand Reply ↓
I’m not understanding the void in the middle, on your setback slide. Is that void going to be used? Reply ↓
Floor to floor height is clearer to understand on a section rather than an isometric drawing. Reply ↓
I enjoyed the presentation. I suggest a case study of a building with a large pool. Focus on how it is supported and where the columns are placed. Reply ↓
Shouldn’t there be two egress stairs from the pool area? Is a circular staircase really needed in a gym / health-club? Reply ↓
The zoning envelope is confusing. Egress stairs should be enclosed as well as leading directly outside. Reply ↓
you team’s zoning analysis was thorough, but it felt unclear. Maybe if you titled what each number is it would be clearer to understand
I’m not understanding the void in the middle, on your setback slide. Is that void going to be used?
Floor to floor height is clearer to understand on a section rather than an isometric drawing.
Is a curved architectural staircase the most efficient and fitting solution for this space?
I enjoyed the presentation. I suggest a case study of a building with a large pool. Focus on how it is supported and where the columns are placed.
Shouldn’t there be two egress stairs from the pool area? Is a circular staircase really needed in a gym / health-club?
The zoning envelope is confusing. Egress stairs should be enclosed as well as leading directly outside.