Remember you have two main tasks:
- Continue development of your building massing
- Develop site concepts – 3 options – in Rhino model – without your buildings.
Continue to develop your overall concept- This includes your buildings and your site
Specifically for Tuesday we want you to concentrate on the site.
- Develop your site by itself – we want to see it in plan and from the corner of Atlantic and Columbia Street and at eye level…from different points.
- This can be done in Rhino or a physical model
- Include the bridge if you are planning on including it in your design
- When designing the site begin to label the areas – parking entrance, circulation – bicycle and pedestrian, playgrounds, courtyards, gardens, outdoor sitting areas, dog park, picnic areas, – look at the outdoor amenities from our precedent studies – the big chart.
- After designing options for the site / landscape design begin introducing your buildings.
- Buildings need to be 75′ wide (double loaded corridor) or 40′ (for single loaded)
- We do not want to see the lines of the BQE roadway or any of the offramp / onramps – this should be incorporated into your site design.
If you can visit the site it may help you understand it better…
Screen Captures from Todays Class