Homework for Tuesday March 9th

  • Finish a completed hybrid model – this should have the “greenway” and all 4 streets. IF you use 1″=100′ that is 4″ x 8″ (roughly)
  • Your buildings should be no more than 75′ wide (or 3/4″ is using 1″=100′)
  • Finish your precedent studies
  • Finish all your concept models and photos.

This entry was posted in Announcements. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *