Abbas Masood Prof Richards
Stephen Taylor ENG 2575
Ivan Florentino
Mannix Paul
Group 6 Report
Stage 3
Each team will write an informal report on their group’s progress with the oral product service proposal or oral analytical research report that demonstrates: 1.
- the division of labor among group members.
- the adequate progress of each group member.
- the group’s adequate cooperation.
- an awareness of a supervisory audience. It is each team’s responsibility to track your progress and keep notes that can be integrated into this report.
The division labor was equally dispersed between the group members, every group member was involved in brainstorming ideas and helping each other when needed. Ivan Florentino was the backbone and created the main logo for the product. Abbas provided the proposal product and the script. Mannix and Stephen both created the presentation and website that was used for the product, all group members assisted one another in completion of the assignment.
Each member progressed by researching and reshaping the group work continuously over the past weeks by cooperating with one another through WhatsApp. Great progress has been shown through the drafts and has been noted by each member. The adequate cooperation was high and the involvement of each member has also been high, members were involved and discussed with one another with every change proposed. Many designs were created and the most favorited one was chosen by majority vote within the group. The group was very aware of time management and due dates and responsibly tracked progress and kept notes on what needed to be changed or improved on the website. Through the weeks the research become more in depth and all members were involved in improving the workload and research information that went on in the final draft.
Ivan Florentino – Logo, assistance in website and slides.
Abbas Masood – Proposal provider with research, assistance.
Mannix Paul- Website creator, assistance.
Stephen Taylor- Created slides, assistance.