Required Materials | Aluminium Frame Tempered Glass Encapsulate Material Silicon Solar Cells Back Sheets Junction Box |
Division Of Labor | A team of 10 educated personal in electrical mechanics that can observe the site determine its best location for the panels and commence building them |
Average Build Time | To install one panel it would take about 4-6 hours with the material at hand Multiple panels can span between a week or a couple of months depending on the structure of the site and its efficiency |
Main Goal | Provide a safeline and efficient product that can help gather electricity to power homes and all important devices. Starting out small from town to town to eventually working our way up to the big city. |