Category Archives: journals

(late) week 13

Along with more sanding, This week Rich took the bold step of cutting the upper hull in half…No turning back now. I took the project home to Fiber Glass the Bow of the sub. Word of advise do the Fiber … Continue reading

Posted in journals | 1 Comment

(late) Week 12 : I HATE SANDING!!!!!

To spare you the boring details, We spent the last week and half sanding, cutting, and sanding again….did I mention sanding. Not to mention that an error on my part led to me cutting out a Piece of the hull … Continue reading

Posted in journals | 1 Comment

(Late) week 11

The kit arrived and we were left speechless. the amount of work ahead of us seemed daunting.  Steph and I spent Sunday cataloging and labeling our parts so that we could verify we had everything. Aside from some tape and … Continue reading

Posted in journals | 3 Comments

(late)Week 10

As stated in my teamates posts shipping delays caused us to have to hold off on production. We did have a plan and we hit the ground running.

Posted in journals | Leave a comment

Dino – Week 15 Journal

Things are coming together with the submarine. We managed to get the DC motor and accessories mounted and the finishing touches on the  hull were completed the week prior. With the bulk of the physical assembly completed, it’s time to … Continue reading

Posted in journals | Leave a comment

Extra Post (Non-Newtonian Liquid)

I don’t usually post anything else other than journal entries and lab reports but I was blown away by this video.

Posted in journals, Uncategorized | 6 Comments

Week 15 Journal Entry

FINALLY! This past Saturday our group met for most of the day at school to work on our project. At this point and time it is safe to say that submarines are a real pain in the ass.  And I’m … Continue reading

Posted in journals | 2 Comments

Week 15 Journal Entry by Frank Mason

“We’re changing the world with technology.” -Bill Gates For this week, we have been implementing all of the pieces of the hardware (Arduino Board, servo motors, waveshield, amplifier, etc.) into the Hell Rabbit. So far, we have been mostly successful … Continue reading

Posted in journals | Leave a comment

Journal 12-2-13

ON TUESDAY, December 3rd, we were able to make some solid progress with the submarine, although there is still quite a ways to go. The exterior hull is complete (sanded, supports bonded etc.) and we are now moving to attaching … Continue reading

Posted in journals | Leave a comment

Journal – Week X

Today, with no classes and a postponed speech assignment, I was able to spend a good chunk of the afternoon and evening working on the LED strips. I was so productive, I felt it was worthy of a mid-week makeup … Continue reading

Posted in journals | 3 Comments