Day 12 – Thursday October 10th

Today’s Agenda

  • Completion of Steel Connections
    • MIRO Peer Grading
    • Upload to Brightspace Due (PDF and Revit file)

NO CLASS ON TUESDAY, OCTOBER 15th!!!

    • Building the Revit Model
      • Add Grids & Levels
        • Vertical grids spacing: 12’, 12β€²,8β€²,12′
        • Horizontal grid spacing: 9β€²,9′,9′ grids
        • Levels:
          • 1 to 2: 14′
          • 2 to 3: 12′
          • 3 to 4: 12′
      • Add Structural Columns – copy up as needed
        • Modify Level 3 to have fewer columns
        • Add longspan open web joists to roof (grid lines 2-5 A-D)
        • Add 4 notched beam joists (grid lines 1-2 B-D) use connections family
      • Add Structural Beams (with tags)
        • Review detail Level setting to see columns and beams
      • Add 6β€³ foundation slab for level 1 (1β€²-6β€³ outside of grids – aligns with face of exterior wall)
      • Add slabs levels 2 to 4 (roof) (5β€³ = 3β€³ LW concrete on 2β€³ metal deck)
        • 8β€³ outside of grid lines on all sides
        • Shift all beams down 5β€³
      • Add generic facade wall (exterior aligned with foundation slab)
        • 8β€³ generic wall (1′-6β€³ outside of grids or 2β€³ gap to slabs)
      • Add punched windows (centered in each grid bay)
        • Fixed 72β€³ x 48β€³
        • Fixed 36β€³ x 48β€³
    • The New Titleblock
      • Use large 72 x 120 (to be plotted 50%)
      • Open Student Titleblock from last semestet
        • Copy Selfie and customize name etc.
      • Place 4 view on the first sheet
        • Plan/Section/Elevation/Isometric (3/8β€³ scale as a start)
      • Duplicate Project File
        • 1 for Curtain WallΒ  (Lastname.Firstname FA.24 Novillo Curtain Wall)
        • 1 for Rain Screen (Lastname.Firstname FA.24 Novilo Rainscreen)
    • Introduction to Curtain Wall Tool
      • Modify the exterior wall to a curtain wall
      • Add horizontal and vertical mullions
    • Selecting a system
      • Each student must select 2 Rainscreen options and 2 Curtain wall options.Β  In next class we will finalize selections – each of you will be required to complete 1 Rainscreen and 1 Curtainwall study.
      • No more than 2 students can use the same system
      • Divide up in teams to help choose systems
        • Link to Rainscreen choices (link)
        • Link to Glazing choices (link)
          • Choose from Curtain Wall or Window Wall
        • Link to assignment description (link)
Due for next class (Due 10/17):
  • Complete your research sheet
    • identify 2 options for each type (2 Glazing & 2 Rainscreen)
    • Post details for the choices into MIRO
    • Include URL links for each system so they can be reviewed in greater detail
    • We will finalize selections in next class
  • Complete your 3d Models & view
    • Complete the Rain Screen Model
    • Place images on the sheet
    • Complete the Curtain wall model
    • Place images on the sheet
    • Post both sheets to MIRO

Leave a Reply

Your email address will not be published. Required fields are marked *

Skip to toolbar