Problem 4

Problem 4
F2M

Description
for this problem we needed to act as technical directors in budgeting, building, and planning a show to go into the powerhouse theatre. First we needed to provide a budget estimate and labor estimate for making all scenic elements of the show. After getting the budget approved we needed to produce construction drawings and other paperwork needed to communicate what a Tech Director needs to show a crew in order to get the show going.

Analysis

This was basically already a real world scenario. Everything was mocked up in a way that resembled a real show.

Application
from this project I learned, that there needs to be more time on the clock. This project was a big hit to the face, telling me that I need to manage my time better and i will find a way to do that for future projects.