Peanut Butter and Jelly Sandwich (Marcelo, Miguel and Massiel)
We had to prepare a set of construction documents and materials so that the local crew of PBJ-2K can assemble the sandwich before the show.
We were not allow to have contact with the assembling crew. All or documents were providing all the information needed to finish the task successfully.
The problem was completed and clear for us. Our attack was the price. We kept budget down and try to have a clear list of steps to build the sandwich having a different knife for spreading and cutting.
The real challenge was noticed when the load in started. Thea anxiety attacked us because we could not talk and said anything but our work was efficient because Rudy understood all the instruction and completed the task without confusion.
Actually in real world the crew works with drawings and instruction the Technical Director cannot be every time there and one of the ways to communicate is through drawings and instruction and if they are clear the project will be a success.