INSTALLATION VIDEOS-TENLY LAW

TIME STAMPS:

0:03-0:12 SPIDER CLIP ASSEMBLY

0:16-0:26 GLASS PANEL ASSEMBLY

0:28-0:53 GLASS PANEL AND SPIDER INSTALLATION ASSEMBLY

TIME STAMPS:

1:36-2:35 STEEL FRAME INSTALLATION

2:42-2:53 LOWER STEEL WALL INSTALLATION

2:55-3:15 MORE STEEL FRAME INSTALLATION

3:17-6:06 REPITITION OF STEEL FRAME AND STEEL WALL PANEL INSTALLATION

Video Research – VMZINC (DRI-DESIGN) AND 1600SS CURTAIN WALL (KAWNEER) – DOLMA TSERING

VMZINC (DRI-DESIGN)

1:18 – BRACKETS INSTALLATION

1:28 – RAFTERS FIXED TO BRACKETS

1:33 – PERFORATED BASE TRIM INSTALLATION

1:51 – INSTALLATION OF INTERLOCKING PANELS

2:30 – INSTALLATION OF SPLICE PLATE

3:13 – FLASHING INSTALLATION

1600SS CURTAIN WALL (KAWNEER)

2:58 – INSTALLATION OF RAIL

3:04 – APPLYING SEALANT

4:14 – SETTING CHICKEN HEAD

4:59 – INSTALLING ANCHOR

6:19 – INSTALLATION OF CRITICAL SEAL

9:04 – SETTING THE UNITIZED PANEL