ENT 4410 TEAM PROJECT 2

For the second project, we had to build on the first project and add things like labor estimate, build calendar, load-in plan, strike plan, and piece list while we also fixed up things from project 1. From the things in project 1, I had to fix up my platforms so that they could be visible for people to see, as well as add extra things like paint and brick treatment. Along with all of that, I decided to get rid of the coffin locks and move down my smaller platforms that I originally put upstage to the middle of the stage so that I could connect them with nuts and bolts now instead of using coffin locks, which would’ve cost more money and taken more time cause of the amount of coffin locks that would be needed and the amount of time it would take to add all those extra coffin locks. Also, the sequence for the locks would have to be pretty specific, which would’ve made moving the platforms around harder if you wanted to move them to a different spot

From this
to this

Also, for one of the platforms that I had that were longer than 8 feet, I didn’t add an extra rail to hold the lid seams, which I ended up adding on in my updated drawing

mistake not adding an extra brace
corrected mistake