PRAM Presentation

PRAM Presentation

This entry was posted in Uncategorized. Bookmark the permalink.

7 Responses to PRAM Presentation

  1. mrdicar says:

    A bottom layer of concrete is poured on the casting bed. A second layer of concrete with collapsible tubes or light weight aggregate to form voids is deposited. The tubes or aggregates are removed after he concrete has cured.

  2. Billi says:

    I feel this presentation clearly showed the advantages and disadvantages of using the precast solid slab.

  3. dbatista says:

    All the text and pictures go hand in hand, the pictures show clearly what the text is trying to say and vise-versa.

  4. Susan Mani says:

    I found the presentation informative. Good job guys.

  5. This group presented very uses information on manufacturing of hollow core slabs.

  6. Jonathan says:

    presentation was straight forward but it was information also.

  7. jasonng903 says:

    The part that talk about the advantages and disadvantages of the hallow core slab is very helpful, it helps me a lot to decide which structure system to use for the structure.
    And the connection detail in interesting. Thank you!

Leave a Reply